2008 Rifle Clean Up Recap
Heading out the door? Read this article on the new Outside+ app available now on iOS devices for members! Download the app.

This is what we did:
-
Built a nice staircase trail from the Nappy Dugout up the hill to the climb PMS, then down the other side to the base of Kingfisher.
-
Built stairs up the trail on the left side of the Proj- ect Wall.
-
Built a retaining wall/platform to prevent erosion and ease access at the base of the Project Wall.
-
Expanded the Project Wall parking area to 4 spaces.
-
Repaired the damaged bridge to the Sno-Cone Wall.
-
Cleared brush from the Upper Koper Trail.
-
Replaced old, rusty, or poorly located bolts on many classic climbs.
-
Cleaned up tons of trash.
-
Hosted a packed house BBQ and raffle with over 140 people. Voluntary donations towards next year’s canyon improvements exceeded $500.